Machine start-up checklist
This checklist covers a two-minute check by the operator before the first job of the shift. Tick each item at the point of work and record any failure.
1Before the shift or opening
- Operator's name is on the job card
- Machine guard is fittedMUST
- Emergency stop check is recorded [VERIFY]MUST
- Work area has no loose tools
2At the point of work
- Lubrication level is inside marked range
- Air or coolant supply is available
- No abnormal leak is visibleMUST
- Correct programme or setting is selected
3Before handover or close
- Drawing revision matches the job card
- Trial piece has been checked
- Unusual sound has been reported
- Start-up entry has a time and signatureMUST
Check before you rely on it. These need a check for your site or with the official source: Emergency stop check is recorded. This is a practical starting list, not a legal or safety certificate.
When to use it
The machine operator uses this list at the start or close of the relevant shift. Allow about 2 minutes for the checks, plus time for any problem found. Work from the shift board, daily register or open-issues sheet. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: a two-minute check by the operator before the first job of the shift. First confirm operator's name is on the job card, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The machine operator records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when lubrication level is inside marked range cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking machine guard is fitted without looking at the actual item or source record.
- Writing "done" when air or coolant supply is available has not been checked.
- Closing the sheet even though drawing revision matches the job card is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a fabrication business, adapt the references to the part, lot, machine or delivery document your team actually uses. In pump assembly, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the machine operator which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the machine start-up checklist?
The machine operator who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if operator's name is on the job card cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.