New godown or branch checklist

This checklist covers setting up a new warehouse or branch: registration, stock, people [VERIFY GST]. Tick each item at the point of work and record any failure.

0 of 12 checked

1Review what is coming

  • New site address and control are recordedMUST
  • Registration and tax implications are checked [VERIFY]
  • Rack and location codes are planned
  • Opening stock list is approvedMUST

2Confirm readiness

  • Site security and access are checked
  • Goods receipt method is agreed
  • Responsible stores person is named
  • Stock transfer documentation is reviewed [VERIFY]MUST

3Assign and follow up

  • First inward is tested
  • First outward is reconciled
  • Customer delivery location is updated
  • Branch opening approval is signedMUST
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Registration and tax implications are checked; Stock transfer documentation is reviewed. This is a practical starting list, not a legal or safety certificate.

When to use it

The branch setup lead uses this list when setting up or approving this activity. Allow about 10 minutes for the checks, plus time for any problem found. Work from the owner review sheet and department status reports. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: setting up a new warehouse or branch: registration, stock, people [VERIFY GST]. First confirm new site address and control are recorded, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The branch setup lead records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when site security and access are checked cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking registration and tax implications are checked without looking at the actual item or source record.
  • Writing "done" when goods receipt method is agreed has not been checked.
  • Closing the sheet even though first inward is tested is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a fabrication business, adapt the references to the part, lot, machine or delivery document your team actually uses. In packaging, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the branch setup lead which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the new godown or branch checklist?

The branch setup lead who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if new site address and control are recorded cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →