New product launch checklist
This checklist covers costing, samples, approvals, pricing and first orders. Tick each item at the point of work and record any failure.
1Review what is coming
- Customer problem and demand are recordedMUST
- New product specification is approvedMUST
- Trial cost estimate is reviewed
- Target selling rate is proposed
2Confirm readiness
- Sample test plan is written
- Approval from customer is documentedMUST
- Tooling readiness is checked
- First batch capacity is reserved
3Assign and follow up
- Sales and production handover is signedMUST
- Launch stock is identified
- Customer feedback owner is named
- First order review date is set
When to use it
The owner or operations manager uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the owner review sheet and department status reports. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: costing, samples, approvals, pricing and first orders. First confirm customer problem and demand are recorded, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The owner or operations manager records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when sample test plan is written cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking new product specification is approved without looking at the actual item or source record.
- Writing "done" when approval from customer is documented has not been checked.
- Closing the sheet even though sales and production handover is signed is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a packaging business, adapt the references to the part, lot, machine or delivery document your team actually uses. In fabrication, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the owner or operations manager which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the new product launch checklist?
The owner or operations manager who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if customer problem and demand are recorded cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.
Read next
- Related process
- Related problem
- Related checklist
