Sales and customers12 checkseach timeabout 5 minutes, estimate; adjust for site

Order acceptance checklist

This checklist covers capacity, material, credit and terms before saying yes. Tick each item at the point of work and record any failure.

0 of 12 checked

1Check the enquiry or account

  • Customer PO details are completeMUST
  • Credit limit status is checked
  • Required material is available or planned
  • Machine capacity covers promised date

2Review the commitment

  • Customer drawing revision is current
  • Pricing matches approved quoteMUST
  • Special packing is noted
  • Payment terms are accepted

3Approve and communicate

  • Exceptions have approvalMUST
  • Sales order is created once
  • Customer confirmation is prepared
  • Release to production is recordedMUST
Send it on WhatsApp

When to use it

The sales coordinator uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the enquiry, quote or customer account register. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: capacity, material, credit and terms before saying yes. First confirm customer PO details are complete, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The sales coordinator records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when customer drawing revision is current cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking credit limit status is checked without looking at the actual item or source record.
  • Writing "done" when pricing matches approved quote has not been checked.
  • Closing the sheet even though exceptions have approval is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a pumps business, adapt the references to the part, lot, machine or delivery document your team actually uses. In auto components, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the sales coordinator which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the order acceptance checklist?

The sales coordinator who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if customer po details are complete cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →