Maintenance12 checkseach timeabout 5 minutes, estimate; adjust for site

Preventive maintenance checklist

This checklist covers what to check on each scheduled maintenance visit. Tick each item at the point of work and record any failure.

0 of 12 checked

1Prepare and make safe

  • Machine ID matches maintenance planMUST
  • Machine is handed over safely [VERIFY]
  • Last defects are reviewed
  • Required spare parts are present

2Inspect or restore

  • Lubrication points are checked
  • Belts or couplings are inspected by authorised staff [VERIFY]MUST
  • Air and hydraulic leaks are observed
  • Guard condition is checked [VERIFY]MUST

3Test and hand over

  • Test run is supervised [VERIFY]MUST
  • Work done is logged
  • Open faults have owners
  • Production accepts the machine back
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Machine is handed over safely; Belts or couplings are inspected by authorised staff; Guard condition is checked; Test run is supervised. This is a practical starting list, not a legal or safety certificate.

When to use it

The maintenance in-charge uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the machine service log and maintenance register. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: what to check on each scheduled maintenance visit. First confirm machine ID matches maintenance plan, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The maintenance in-charge records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when lubrication points are checked cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking machine is handed over safely without looking at the actual item or source record.
  • Writing "done" when belts or couplings are inspected by authorised staff has not been checked.
  • Closing the sheet even though test run is supervised is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a plastics business, adapt the references to the part, lot, machine or delivery document your team actually uses. In food processing, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the maintenance in-charge which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the preventive maintenance checklist?

The maintenance in-charge who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if machine id matches maintenance plan cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.