Scrap sale checklist
This checklist covers weighing, recording, rate approval and billing before scrap leaves. Tick each item at the point of work and record any failure.
1Confirm the reference
- Scrap class and ownership are clear
- Scrap is separated from usable material
- Weight scale reading is recordedMUST
- Approved buyer and rate are on fileMUST
2Check the material or location
- Scrap lot is weighed with witness
- Price calculation matches weightMUST
- Gate pass references the sale
- Applicable billing documents are prepared [VERIFY]
3Record and release
- Vehicle number is noted
- Payment terms are recordedMUST
- Scrap ledger balance is reduced
- Sale is reconciled to books
Check before you rely on it. These need a check for your site or with the official source: Applicable billing documents are prepared. This is a practical starting list, not a legal or safety certificate.
When to use it
The stores and accounts lead uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the challan book, stock register or stores desk. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: weighing, recording, rate approval and billing before scrap leaves. First confirm scrap class and ownership are clear, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The stores and accounts lead records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when scrap lot is weighed with witness cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking scrap is separated from usable material without looking at the actual item or source record.
- Writing "done" when price calculation matches weight has not been checked.
- Closing the sheet even though vehicle number is noted is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a castings business, adapt the references to the part, lot, machine or delivery document your team actually uses. In trading, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the stores and accounts lead which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the scrap sale checklist?
The stores and accounts lead who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if scrap class and ownership are clear cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.
Read next
- Related process
- Related problem
- Related checklist
