5 Whys
The 5 Whys is a root cause technique in which you ask "why" repeatedly, usually about five times, until you reach a cause that can be fixed.
What it means
You state the problem clearly and ask why it happened, then ask why again for each answer until it points to a process gap, not a person's slip. Five is a guide: some problems need three questions and some seven. Back every answer with evidence.
Example
A customer returns 60 steel brackets with a bent flange. Why bent? Stacked too high in the carton. Why? The packing sheet has no stack limit. Why? It was copied from a lighter product. Why? No one reviews packing sheets for new parts. The fix is a packing-sheet check at product release.
Records and checks
- Record the problem statement, each why with its evidence, the root cause and the action.
- Verify each answer on the shop floor or in records instead of assuming it.
- The quality head leads, the people who do the work join, and the owner follows up.
Common mistakes
- Stopping at "operator error", which blames a person and leaves the process unchanged.
- Following a single chain when the problem has more than one cause.