8D report
An 8D report is a structured record of how a team contained, investigated, fixed and prevented a quality problem, set out in eight disciplines.
What it means
Customers in automotive and engineering supply chains often ask for it after a complaint. The steps are to form a team, describe the problem, contain it, find the root cause, choose a corrective action, verify it, prevent recurrence and recognise the team. It shows the customer the cause is understood and the fix is checked.
Example
A casting supplier ships 500 housings with porosity and the customer asks for an 8D. The team sorts stock in transit, finds the die temperature drifted after a thermocouple failed, replaces it, adds a daily temperature log, and checks three lots before closing.
Records and checks
- Record each of the eight steps with dates, owners, data and attached evidence.
- Verify containment on stock at the customer, in transit and in your store.
- The quality head signs the report, and the customer reviews it before closure.
Common mistakes
- Writing it only to satisfy the customer, with a root cause like "operator negligence" and no process change.
- Closing it before checking that the fix worked on later production.