AQL
AQL, short for acceptance quality limit, is the defect level agreed between buyer and supplier that decides whether a sampled lot is accepted or rejected.
What it means
People mention AQL when a buyer's inspector arrives before shipment. The number appears in the purchase terms, for example AQL 2.5 for major defects. Sampling tables, such as those in ISO 2859-1, then give the sample size for the lot and the accept and reject counts.
Example
A toy exporter ships 3,200 plush toys under AQL 1.5 for major defects. The inspector's table calls for a sample of 125 pieces, allows five major defects and rejects at six. He finds four, so the lot passes, and the supplier fixes those four in the carton.
Records and checks
- Record the AQL for each defect class, the inspection level, the sample size and every defect found.
- Verify that the sample is drawn at random from all cartons, not from the top layer.
- The buyer's inspector decides on the lot, and the factory quality head keeps a copy.
Common mistakes
- Picking the cleanest cartons as the sample, which hides real defect levels.
- Reading AQL 2.5 as "2.5 per cent defects are permitted in every lot".