lamp.
ResourcesPricingAbout

Assembly point

An assembly point is a designated safe place outside the building where people gather after an evacuation, so that a headcount can be taken and anyone missing identified.

What it means

Getting out is only half the job. Once outside, people need a known place to stand, away from the building, vehicles and fire fighting access, where a responsible person can count them. The place is marked with a sign, shown on the site map and told to every employee and visitor.

Example

A 60-person workshop uses the open yard beside the main gate as its assembly point, marked with a green sign. In the evacuation drill the floor supervisors count 58 present and find two staff were on a delivery.

Records and checks

  • Record the location, the sign, the person who counts and the headcount in every drill or real event.
  • Verify that the spot stays clear of stored goods and parked vehicles, and that the route to it is open.
  • The safety coordinator checks monthly, and the owner reviews drill results.

Common mistakes

  • Choosing a spot too close to the building or the loading bay, where people may be in danger.
  • Not counting visitors and contract workers, so someone inside is overlooked.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →