lamp.
ResourcesPricingAbout

Asset tag

An asset tag is a durable label with a unique number, sometimes with a barcode or QR code, fixed to an asset so it can be identified in the register.

What it means

The tag links the physical machine to its record. Staff can read the number, find the right history and avoid mixing up identical units. Tags are usually metal or tough plastic and are fixed where they cannot be scratched off. During stock-taking, the tag number is matched against the asset register to confirm that each item is still there.

Example

A workshop with six identical lathes tags them LT-01 to LT-06. A repair is logged against LT-04, so its bearing replacements are not confused with those of LT-05.

Records and checks

  • Record the tag number against the asset, its location and the date of tagging.
  • Verify at every physical check that the tag is present, legible and on the right asset.
  • The maintenance lead issues tags; accounts matches them to the register during the annual verification.

Common mistakes

  • Using paper stickers that peel off in oil or heat.
  • Moving a machine without updating its location, or reusing a tag number on a new asset.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →