Attendance lock
An attendance lock is the point at which a period's attendance is frozen, after which any change needs a formal approval and a recorded reason.
What it means
Payroll can only be right if attendance stops moving. A lock is set on a cut-off date after supervisors finish corrections for leaves, late marks, missed punches and overtime. After it, the days, overtime hours and leave used feed wages without edits. If a genuine mistake appears later, it is fixed through a documented reopening or carried to the next month as an adjustment.
Example
A 120-worker garment unit locks June attendance on 2 July at 6 pm. On 4 July, a supervisor finds a worker was marked absent on a day the worker was on duty. The change goes through the HR head, is logged with the reason and is applied to July payroll as an adjustment.
Records and checks
- Record the lock date and time, who locked it, and every later change with approver and reason.
- Verify before locking that there are no missing punches, unapproved leaves or overtime without sign-off.
- The department supervisor submits, HR locks and the finance head signs off before wages are processed.
Common mistakes
- Allowing edits after the lock through a back door, so the paid wages no longer match the attendance report.
- Locking early to meet a deadline with pending corrections still open.