Authentication
Authentication is the process of proving that a person or system is who they claim to be, before being allowed to use an account, application or facility.
What it means
It answers "who are you?", while access control answers "what may you do?". The proof can be something you know, such as a password, something you have, such as a phone receiving a code, or something you are, such as a fingerprint. Stronger proof is needed where the risk is higher, for example before approving a payment.
Example
A trading firm's accountant logs into the bank portal with a user ID and password, then confirms with a one-time code sent to the registered phone. A colleague who knows the password but lacks the phone cannot release a ₹6 lakh vendor payment.
Records and checks
- Record which systems need sign-in, the proof each requires, and the login attempts, successes and failures.
- Verify that default passwords are changed, shared accounts are removed and former staff cannot sign in.
- The IT owner configures it and the owner reviews unusual login activity on critical systems.
Common mistakes
- Using one shared login for a department, so no action can be traced to a person.
- Keeping passwords on sticky notes or in a group chat.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →