Availability loss

Availability loss is the planned production time lost because a machine was stopped, whether for breakdowns, setups, changeovers, waiting for material or other reasons.

What it means

It is one of the three losses in overall equipment effectiveness, alongside performance and quality losses. Any stoppage long enough to be recorded counts, usually a few minutes or more. Breaking availability loss into reasons shows where to act: a plant losing most time to changeovers needs a different remedy from one losing it to breakdowns.

Example

A machine is planned to run 480 minutes in a shift. It loses 50 minutes to a changeover, 30 to a breakdown and 20 waiting for material, so availability loss is 100 minutes, and availability is about 79 per cent.

Records and checks

  • Record each stoppage with start time, duration, machine and the reason selected from a fixed list.
  • Verify the total stopped time against the planned time and the production count.
  • The operator logs stoppages; the supervisor reviews the top reasons daily and the owner weekly.

Common mistakes

  • Leaving short stoppages unrecorded, which hides a large part of the loss.
  • Using a long list of vague reasons, so the biggest cause is not clear.