Barcode
A barcode is a printed pattern of bars or squares that encodes a number or text, so a scanner can read it quickly and accurately.
What it means
In retail, the barcode stands for the product code or SKU. Scanning it brings up the item name and price in the billing system, speeding checkout and removing typing errors. Shops print their own labels for goods that lack one.
Example
A garment shop prints a label for each shirt with a code that stands for style, size and colour. At billing, the cashier scans the label and the right item and price appear. During stock-take, the staff scan shelf by shelf and the count is matched with the system the same evening.
Records and checks
- Record the barcode against the item code, size, colour and price in the item master.
- Verify that labels scan correctly and carry the right item before they go on stock.
- The stores head manages labelling, and the cashier reports any unreadable code.
Common mistakes
- Using one barcode for items of different sizes or prices, which ruins stock records.
- Printing on low-quality labels that fade or smudge and fail to scan.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →