Bend allowance
Bend allowance is the arc length of the neutral axis through a bend, added to the straight flange lengths to find the flat blank length needed for a bent part.
What it means
When sheet metal is bent, the outer surface stretches and the inner surface compresses. A line inside the thickness, the neutral axis, keeps its length. It depends on the angle, inside radius, thickness and a K-factor set by material and tooling.
Example
A 2 mm mild steel channel has an inside radius of 2 mm and a 90 degree bend, with a K-factor of 0.4. The bend allowance works out to about 4.4 mm. A designer adds that to the two flat lengths to get the blank size before cutting on the laser.
Records and checks
- Record the material, thickness, bend angle, inside radius, tool used and K-factor value used for the part.
- Verify with a trial bend before cutting the full batch.
- The fabrication engineer approves the value, and the press brake operator reports any difference found at trial.
Common mistakes
- Using a textbook K-factor without checking it on your own press brake and tooling.
- Mixing up bend allowance with bend deduction when entering values in the cutting program.