Bill of materials revision
A bill of materials revision is a new, dated version of a product's parts and quantities list, created after a design, supplier or process change.
What it means
A product's list of components changes over time: a part is replaced, a quantity is trimmed, a cheaper alternative is approved. Each such change creates a new revision with its own identifier and effective date, and the previous one is kept for reference. Purchasing, stores and production must all use the same current revision, or one team buys parts for a design another team no longer builds.
Example
A switchboard maker in Vadodara replaces a 63 A MCB from one brand with another in model SB-12. Revision B of its parts list takes effect from 1 March. Stores still holds 40 old MCBs, so the revision note says to use them on orders until stock ends, and the new part for later orders.
Records and checks
- Record the revision letter, effective date, what changed, why, and who approved it.
- Verify that purchasing, stores and the shop floor all hold the same current revision.
- The design or engineering lead approves; the production planner confirms stock handling for old parts.
Common mistakes
- Making the change but not stating a date, so old and new parts get mixed in one batch.
- Leaving the superseded list on shop-floor printouts, so assemblers use a withdrawn version.