lamp.
ResourcesPricingAbout

Blow moulding

Blow moulding is a process that makes hollow plastic parts, such as bottles and cans, by inflating a heated plastic tube or preform with air inside a closed mould.

What it means

Plastic is melted and formed into a hollow tube, called a parison, or an injected preform. A mould closes around it and compressed air expands it against the cavity walls, where it cools and sets. The mould opens and the item is ejected, and excess material at the neck and base is trimmed. It suits containers, drums and tanks where an injection mould could not form a hollow shape.

Example

A small unit makes 1-litre HDPE oil bottles on an extrusion blow machine with a 4-cavity mould. Each cycle takes 14 seconds and yields four bottles of 38 g. The operator checks the wall thickness at the base and the neck finish every hour, as thin bottoms cause leaks.

Records and checks

  • Record material grade, melt temperature, air pressure, cycle time, bottle weight and rejection count by shift.
  • Verify weight, neck dimensions, wall thickness and a leak or drop test on samples at fixed intervals.
  • The operator logs readings, the quality inspector verifies the samples, and the production head reviews rejections.

Common mistakes

  • Letting bottle weight creep up to avoid rejects, which wastes material on every piece.
  • Ignoring uneven wall thickness, which passes the visual check but fails in use.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →