Breakdown maintenance

Breakdown maintenance is the practice of repairing equipment only after it has failed, with no planned servicing beforehand.

What it means

It is the simplest approach: run until it breaks, then fix. It can suit cheap, non-critical items with spares at hand, such as a small fan. For key machines it usually costs more through stopped production, rush spares, overtime and damage from running a fault to the end. Many firms use it on low-value items and apply preventive or condition-based methods to the rest.

Example

A packing line's sealing heater burns out during an order, stopping the line for five hours. With 12 workers idle at ₹500 a day each, plus a rush part at ₹3,500, the avoidable loss exceeds ₹8,000.

Records and checks

  • Record the failure time, cause, repair done, parts used and downtime hours for each breakdown.
  • Verify repeat failures by looking at the history of each machine every month.
  • The maintenance supervisor logs the event; the production head reviews recurring breakdowns.

Common mistakes

  • Using it on a critical machine with no spare part in stock.
  • Fixing the symptom and not recording the cause, so the same fault returns.