Buyer approval
Buyer approval is the buyer's written confirmation that a sample, colour, fabric, fit, trim or process is acceptable, so the maker can go ahead with the next stage.
What it means
In export and brand work, nothing moves to bulk until the buyer signs off. Typical approvals cover lab dips, fabric quality, fit samples, size set, pre-production sample, labels and packing. The approval is a record: it names what was approved, with comments and the date. Production that goes ahead without it carries the cost of any later rejection.
Example
A Noida garment exporter sends a pre-production sample for a ₹38 lakh order. The buyer approves with a comment to lower a pocket by 1 cm, and the factory records the change before releasing cutting.
Records and checks
- Record what was approved, the date, the buyer contact and every comment.
- Verify bulk production follows the approved sample and its comments.
- The merchandiser owns the approvals; quality checks bulk against them.
Common mistakes
- Accepting approval by phone or chat and not saving it in the file.
- Starting bulk on a conditional approval before the conditions are met.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →