lamp.
ResourcesPricingAbout

CBM

CBM stands for cubic metre, a unit of volume; in shipping it is the space a package or load occupies, found as length times width times height in metres.

What it means

Sea freight and many road and courier rates depend on the space goods take, not only their weight. For a carton you multiply length, width and height in metres, then multiply by the number of cartons. Forwarders use total CBM to book container space or charge for part loads. A 20-foot container holds roughly 25 to 28 CBM of usable cargo.

Example

An exporter packs 120 cartons, each 0.6 m by 0.5 m by 0.4 m. Each is 0.12 CBM, so the shipment is 14.4 CBM, and at a part-load rate of ₹4,500 per CBM the freight is ₹64,800.

Records and checks

  • Record carton dimensions, carton count and total CBM on the packing list.
  • Verify a few cartons by measuring at packing, since stated sizes are often a centimetre or two off.
  • The shipping clerk calculates; the export manager checks the forwarder's CBM before bills are approved.

Common mistakes

  • Mixing centimetres and metres, giving a result a million times off.
  • Measuring the product instead of the outer carton including its bulge.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →