Clamp force

Clamp force is the force that holds the two halves of a mould closed against the pressure of injected plastic, measured in tonnes or kilonewtons.

What it means

Plastic pushes the mould halves apart when it is injected. The machine must hold them shut harder than this opposing force or plastic leaks out at the parting line as flash. Too little force gives flash. Too much wears the mould and wastes energy. Required force depends on the projected area of the parts and runners and the pressure in the cavity, and machines are rated by their maximum clamp force.

Example

A mould for a 120 mm tray has a projected area of about 300 cm2. The tool setter starts at a modest tonnage, sees flash at the edge, increases the force step by step and stops once the flash disappears, then records the setting on the setup sheet for the next run.

Records and checks

  • Record the clamp force set, the mould, the machine, the date and the setter who found it.
  • Verify the part for flash after setting, and check that the force is not near the machine's limit.
  • The setter adjusts, the quality inspector confirms the first article, and maintenance checks the tie bars if readings vary.

Common mistakes

  • Using full force on every job, which damages the mould and the machine.
  • Raising the force to hide flash that comes from a worn parting line.