CMMS
A CMMS is a computerised maintenance management system used to plan preventive maintenance, log breakdowns, and track spare parts, labour and cost for each machine.
What it means
Each machine has a record with its service history, schedule and spare list. The system raises work orders when service is due, shows overdue jobs and totals downtime and maintenance cost. Over time it shows which machines fail often and which spares to stock, so maintenance moves from reacting to planning.
Example
A bottling plant in Bhopal logs each filler breakdown. The records show one bearing failing every three months with ₹9,000 of lost output each time, so the team schedules a replacement before it fails.
Records and checks
- Record machine, work order, fault, time lost, parts used and cost.
- Verify completed jobs against the maintenance technician's sign-off.
- The maintenance head reviews overdue and repeat failures monthly.
Common mistakes
- Closing work orders without entering parts used, so cost history is wrong.
- Setting service intervals once and never adjusting them from failure data.