Colour masterbatch

Colour masterbatch is a concentrate of pigment in a carrier plastic, added in a small percentage to natural resin to colour the finished product.

What it means

Instead of buying coloured plastic for each shade, a plant buys natural resin and adds a pellet concentrate that carries the colour. The addition rate, often a few percent, is called the let-down ratio. The mixing must be uniform, otherwise the product shows streaks or shade drift. The pigment must also suit the resin and the use, for instance heat stable for the processing temperature.

Example

A bucket maker makes red buckets from polypropylene. The batch sheet says 2 kg of red masterbatch per 100 kg of resin, which is 2 percent. An operator mixing 2.5 kg by mistake produces darker buckets, and the first-piece check against the colour standard catches it.

Records and checks

  • Record the masterbatch supplier, code, lot number, let-down ratio and the quantity used per batch.
  • Verify the colour of the first piece against the approved sample and weigh the dosing for each batch.
  • The operator doses, the quality inspector approves the shade, and stores confirm the lot is the approved one.

Common mistakes

  • Changing the supplier or lot without a shade check, so the colour drifts from the approved standard.
  • Dosing by eye rather than by weight or a metering unit.