lamp.
ResourcesPricingAbout

Colourway

A colourway is one specific colour combination of a style, covering the body fabric, contrast parts, trims and prints used together.

What it means

One style can be made in several colourways, such as navy with white piping or maroon with grey. Each colourway needs its own approved fabric shade, matching thread and trims, and its own quantity in the order. Buying and cutting plans are made per colourway, so mixing them causes shade or trim errors.

Example

A kidswear maker in Ludhiana books 6,000 pieces of one T-shirt in three colourways of 2,000 each. Each has a different rib and print colour, so the stores issue separate fabric and trims lists for each.

Records and checks

  • Record the colourway name or code, fabric, trims, print and quantity per size.
  • Verify that approved lab dips exist for each part of each colourway.
  • The merchandiser maintains the list; stores and cutting check against it.

Common mistakes

  • Using a similar looking trim from another colourway because stock is short.
  • Planning the order total without splitting quantity by colourway and size.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →