Comparative statement
A comparative statement is a table placing quotations from different suppliers side by side on price, terms, delivery and quality, so the choice can be justified.
What it means
It is used when a purchase is large enough to ask for several quotes. Each supplier's offer is entered on the same basis: same item, same quantity, and all costs including freight, packing and payment terms. It shows who is cheapest and why, and records the decision. Cheapest on paper is not always best, so notes on quality and reliability sit alongside the price.
Example
For 200 square metres of industrial flooring, a Jamshedpur workshop gets three quotes: ₹820, ₹785 and ₹850 per square metre. The statement adds ₹40 per square metre freight to the second, whose supplier is out of town, making it ₹825, and notes the third offers 60 days of credit. The first is chosen.
Records and checks
- Record each quote with supplier, date, price, freight, taxes treatment, terms and delivery date.
- Verify that every quote is for the same specification and is compared on landed cost.
- The buyer prepares it; the purchase head or owner approves the selection and signs it.
Common mistakes
- Comparing quotes for slightly different specifications, so the cheapest is not like for like.
- Preparing it after the order is placed, only as paperwork to support the choice.