Condition based maintenance

Condition based maintenance is servicing a machine when measured readings such as vibration, temperature or oil quality show that it needs attention, rather than on a calendar.

What it means

Instead of changing parts at fixed intervals, the team inspects or measures the machine and acts when a reading crosses a set limit. This avoids early replacement of good parts and catches faults before a failure. It needs simple instruments, such as a thermometer, a vibration pen or an oil test, and clear limits for each reading. It works best on costly or critical machines.

Example

A textile unit checks gearbox oil every month. When metal content in the sample passes the vendor's limit, it changes the oil and inspects the gears, avoiding a ₹90,000 gearbox failure.

Records and checks

  • Record each reading, the date, the limit and the action taken when the limit is crossed.
  • Verify that instruments are in working order and that readings are taken the same way each time.
  • The maintenance technician takes readings; the supervisor reviews trends and approves actions.

Common mistakes

  • Taking readings but never comparing them to a limit or to earlier readings.
  • Setting limits by guess, not from the maker's manual or past failures.