Confined space entry
Confined space entry is the controlled procedure for working inside a tank, pit, boiler, duct or similar enclosed area where air may be low in oxygen or toxic.
What it means
Enclosed spaces can hide dangers you cannot see or smell: too little oxygen, toxic gas, or flammable vapour. A safe entry needs a written permit, isolation of pipes and power, air testing before and during the job, ventilation, a trained attendant at the opening and a rescue plan.
Example
Before cleaning a 10,000-litre water tank, a maintenance team shuts the inlet, drains the tank, tests the air, ventilates it and keeps one person at the manhole. The permit is closed when everyone is out.
Records and checks
- Record the permit with space, work, time, gas test results, isolations, entrants, attendant and closing time.
- Verify the gas readings with a calibrated meter and confirm that rescue equipment is at the entry.
- The safety officer issues the permit, and the attendant keeps count of who is inside.
Common mistakes
- Going in "for a quick look" without testing the air or issuing a permit.
- Leaving no attendant outside, so nobody raises the alarm if the entrant collapses.
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →