Connected load
Connected load is the sum of the ratings of all electrical machines, lights and appliances connected at a site, usually in kilowatts or horsepower.
What it means
It is the potential demand if everything ran at once at full power. In practice, not all machines run together and many run below rating, so actual maximum demand is lower. It still matters: it appears in the connection application, helps size cables and transformers, and can set the connection category or fixed charge.
Example
A bakery in Nashik lists two ovens of 12 kW each, a 7.5 kW mixer, 2 kW of lights and 4 kW of refrigeration. Connected load is 24 plus 7.5 plus 2 plus 4, which is 37.5 kW, while its peak actual use is about 22 kW.
Records and checks
- Record each machine's rating, quantity and installation date in a register.
- Verify nameplate ratings on site and update the total when equipment changes.
- The electrical in charge reconciles the register with the sanctioned load on the connection each year.
Common mistakes
- Adding new machines without informing the utility, so the sanctioned load is exceeded.
- Confusing connected load with the load actually drawn.
Check the current rule on the official portal or with your CA before acting.