Consent to establish

The permission from the state pollution control board that a unit must obtain before it starts building a plant or installing machinery that may pollute.

What it means

It is the first of two environmental permissions. The board reviews the proposal, the site, the pollution control plan and the treatment arrangements before allowing construction. Which units need it depends on the category of the industry and the rules of the state. The conditions attached, such as effluent treatment or stack height, carry forward into the later consent to operate.

Example

A dye-house planning a new unit near Tiruppur files the site plan, process flow and effluent treatment design with the board. It starts civil work only after the consent letter arrives, and builds the treatment plant exactly as approved.

Records and checks

  • Record the application, the site plan, the process description, board correspondence and the consent letter.
  • Verify that construction follows the approved plan and conditions.
  • The plant head applies, the environment officer tracks conditions and the owner signs.

Common mistakes

  • Starting construction while the application is still pending.
  • Changing the plant design after approval without informing the board.

Check the current rule on the official portal or with your CA before acting.