Consultation slot
A consultation slot is a fixed block of a doctor's time, such as 15 minutes, that a patient can book for a visit.
What it means
Slots turn a doctor's availability into bookable units. A clinic sets slot length by type of visit, for example 10 minutes for a follow-up and 30 minutes for a first visit with tests. Some slots are held for emergencies. When a visit overruns, every later slot slips, so schedulers add small buffers.
Example
A skin specialist works 10 am to 1 pm with 12-minute slots, giving 15 bookable slots. She holds two for urgent cases. A first visit that needs a procedure takes 25 minutes, so the next two patients wait and the front desk calls them to the new time.
Records and checks
- Record the doctor, date, slot start, length, booked patient and slot status: free, booked, held or missed.
- Verify that a slot is not given to two patients and that leave days are blocked.
- The front desk books and the clinic manager reviews utilisation and overruns.
Common mistakes
- Using one slot length for every visit type, which causes long waits after complex cases.
- Not blocking the doctor's leave or surgery hours, so patients arrive to an absent doctor.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →