Container loading
Container loading is placing packed goods into a shipping container in a planned order, secured so they travel safely and use the space well.
What it means
Whoever loads a container controls its cost and its risk. Heavy cartons go at the bottom and gaps are filled with dunnage. An overloaded or badly stacked container risks damage, cargo shift and rejection at the port. Loading is usually witnessed and photographed.
Example
A rug exporter loads 640 bales into a 20-foot container. The packing list says 14.2 CBM, the loaders fill the floor first, then stack to the roof line, and photograph the interior before the doors are closed and sealed.
Records and checks
- Record container number, seal number, loading date, package count and gross weight.
- Verify the packing list against loaded cartons, and check the container for damage and cleanliness first.
- The export supervisor oversees loading and keeps the photos; the forwarder confirms seal and weight.
Common mistakes
- Loading by guess without a packing list, so a shortage is found only at the destination.
- Declaring the wrong gross weight, which can make the port or shipping line stop the container.
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →