Contribution margin
Contribution margin is the selling price of a product less its variable costs, showing how much each sale contributes towards fixed costs and profit.
What it means
Fixed costs such as rent stay the same whatever the sales, while variable costs such as materials rise with each unit. The contribution margin is what is left from a sale after variable costs. Expressed per unit or as a percentage of the price, it shows which products are worth pushing, helps set discount limits and feeds break-even calculations. A product with a low contribution may need a price rise or cost cut.
Example
A stainless steel water bottle sells at ₹500, with ₹320 in variable costs for steel, labour per piece and packing. The contribution margin is ₹180 per bottle, or 36 percent. If a customer asks for a discount of ₹100, the contribution falls to ₹80, which is a drop of over 55 percent.
Records and checks
- Record the selling price and each variable cost per unit, with the source and date of every figure.
- Verify that all variable costs, including freight, commission and packing, are included.
- The costing accountant calculates, sales checks it before quoting, and the owner reviews products with the lowest contribution.
Common mistakes
- Using gross profit instead, which mixes in fixed costs that do not change with each sale.
- Treating all labour as variable when workers are paid a fixed monthly wage.