Cooling time
Cooling time is the period in a moulding cycle during which the part cools and solidifies inside the mould before it is ejected.
What it means
After injection, plastic is hot and soft. It must cool enough to keep its shape when ejected. Cooling often takes more than half of the cycle, so it controls output and cost. Thicker walls, a hotter mould or a poor cooling channel layout need more time. Cutting it too far gives warpage, sink marks or ejection damage, while too much wastes machine hours.
Example
A thick-walled crate handle needs 22 seconds of cooling at the present mould temperature. The process engineer improves the water flow in the mould and tries 18 seconds. Parts stay flat and within size. Saving 4 seconds on a 40-second cycle raises output by about 11 percent.
Records and checks
- Record the cooling time, the mould temperature, the water flow and the part's cycle time.
- Verify after any change that parts hold their size, have no warp or sink, and can be ejected without distortion.
- The process engineer trials changes, the quality inspector measures the parts, and the supervisor signs off the new setting.
Common mistakes
- Shortening cooling to hit a cycle target, then paying for the extra rejects.
- Overlooking blocked cooling channels as the true cause of long cooling.