Corrective and preventive action
Corrective and preventive action is the set of steps taken to remove the cause of an existing problem and to stop similar problems occurring in other places.
What it means
Corrective action deals with a problem that has happened: it finds the root cause and removes it, not only the defective part. Preventive action looks ahead, asking where the same weakness could appear in another product, line or site. Together they are often shortened to CAPA.
Example
A spice packer finds metal specks in one batch, traced to a worn sieve. Corrective action: replace the sieve and add a magnet check each shift. Preventive action: inspect the sieves on the other three lines and set a replacement interval for all of them.
Records and checks
- Record the problem, root cause, actions, owners, due dates and the evidence of effectiveness.
- Verify effectiveness after a set period by checking fresh data, not just that the task was done.
- The quality head tracks open actions, and the owner reviews overdue ones.
Common mistakes
- Closing the action when the task is done, without checking that the problem stopped.
- Writing "retrain the operator" as the fix for every issue.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →