Cpk
Cpk is a capability index that takes the smaller of the distances from the process mean to each specification limit, divided by three standard deviations.
What it means
Unlike Cp, it penalises a process that is off-centre. The calculation is done for both the upper and lower limit and the smaller result is reported. A low Cpk with a high Cp tells you the machine is consistent but needs adjusting to the target.
Example
A hole is specified at 12.00 mm plus or minus 0.05. The process mean is 12.03 and the standard deviation is 0.010. The upper side gives (12.05 minus 12.03) divided by 0.030, about 0.67, while the lower side gives 2.67. Cpk is 0.67, so the process needs recentring even though its spread is small.
Records and checks
- Record the mean, standard deviation, both limits and the sample size.
- Verify that measurements come from a stable process and a gauge that is calibrated.
- The quality engineer reports it, and the production head acts on the centring.
Common mistakes
- Adjusting the machine on one reading instead of studying the average over a sample.
- Comparing Cpk across features without checking that each was measured the same way.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →