Cubage
Cubage is the total volume of a package, pallet or shipment, calculated from outer length, width and height and used to charge freight and plan space.
What it means
The term comes from "cubic" and is used in shipping and warehousing for the space an item takes. A light but bulky item such as foam sheets can fill a truck while weighing little, so carriers look at cubage as well as weight. Warehouses also use it to estimate how many cartons a rack bay can take.
Example
A cushion maker packs 40 bags of 0.9 m by 0.6 m by 0.5 m each. Cubage per bag is 0.27 cubic metres, so the 40 bags need 10.8 cubic metres of truck space despite weighing only 180 kg.
Records and checks
- Record outer dimensions and calculated cubage for each carton type in the product master.
- Verify a few packed units with a tape at dispatch, since compressed or bulging packs change the figure.
- The dispatch lead maintains dimensions; the logistics manager checks them against carrier billing.
Common mistakes
- Using product dimensions instead of the packed carton's outer dimensions.
- Ignoring cubage when quoting freight for light bulky goods, so the quote falls short of the real charge.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →