Cycle time reduction
Cycle time reduction is the effort and result of shortening the time needed to complete one unit of an operation or process, by cutting delays, extra steps and waiting.
What it means
The gain is measured by comparing the new average cycle time with the old baseline. Typical sources are better tooling, a better layout, fewer handovers and fewer interruptions. It should not be bought by quality losses, so output, scrap and rework are watched too. The saved time becomes either more output or lower cost.
Example
A switchboard assembler spends 95 minutes assembling a standard panel. By pre-cutting wires and keeping parts at the workstation, it reduces the time to 78 minutes. Across 20 panels a month, that frees about 5.7 hours.
Records and checks
- Record the old cycle time, the change made, the new cycle time and the number of cycles timed.
- Verify the new time over several runs, not one good day, and check quality did not slip.
- The supervisor times it, and the plant head confirms the saving before updating standards.
Common mistakes
- Claiming a reduction based on a single fast cycle instead of an average.
- Forgetting to update planning standards, so the saved time is never used.