Diesel consumption
Diesel consumption is the quantity of diesel, in litres, used by an engine, generator or vehicle over a period or for a given output.
What it means
It is tracked for generators, pumps, forklifts, boilers and delivery vehicles. The figure alone says little, so businesses pair it with something that explains it: hours run, units of power produced or kilometres driven. Sudden changes without a matching change in work point to leaks, theft, bad injectors or a machine running too lightly loaded.
Example
A factory in Pune's Chakan area buys 2,000 litres of diesel for its DG set in a month. The set made 5,800 kWh in that period. Consumption was 2,000 litres for 5,800 units, which is about 0.34 litre per unit.
Records and checks
- Record each purchase and each filling with date, litres, the machine, meter reading and the person who filled.
- Verify tank stock by dipstick against book balance at least weekly.
- The store or maintenance in charge reports, and the owner reviews any variance above a small tolerance.
Common mistakes
- Filling vehicles and machines from one tank with no individual record.
- Accepting a supplier's quantity without checking the delivery measure.