Dispatch note
A dispatch note is a document made by the seller when goods leave the warehouse, listing what was sent, the quantity, the date, the vehicle or carrier and the destination.
What it means
It is the internal and external record of outbound shipment, prepared when the goods are packed and loaded. It lets stores update stock, accounts raise the invoice, and the customer expect the delivery. If a customer says goods did not arrive, the dispatch note, with the vehicle details, is the starting point for tracing them.
Example
A foundry loads 400 castings onto a truck at 4 pm. The dispatch note records quantity 400, vehicle number, driver's phone and the expected arrival. The customer is sent a copy by message, and the invoice is raised the same evening.
Records and checks
- Record the dispatch note number, date and time, items, quantity, packing, carrier and vehicle number.
- Verify loaded quantity against the order and the pick list before the vehicle leaves.
- The stores head signs it, and the logistics coordinator tracks the vehicle until delivery.
Common mistakes
- Preparing the note after the vehicle leaves, so loaded quantities are estimated from memory.
- Not sharing the vehicle details with the customer, who cannot then plan to receive it.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →