lamp.
ResourcesPricingAbout

Electrical isolation

Electrical isolation is the process of disconnecting equipment from every power source, locking the switch, tagging it and proving it dead before anyone works on it.

What it means

Switching off a machine at its panel is not enough. Someone else may switch it on, a second feed may exist, or a capacitor may hold charge. Proper isolation identifies all sources, opens them, applies a personal lock and tag, and tests with a suitable instrument that the circuit is dead. Only the person who applied the lock removes it.

Example

Before replacing a motor on a conveyor, the electrician switches off the feeder, locks it with his own padlock and hangs a tag with his name. He tests the terminals at the motor, finds them dead, and starts work.

Records and checks

  • Record the equipment, the isolation point, who applied the lock, time on and time off, and the test result.
  • Verify with a tester proved on a known live source before and after.
  • The electrician applies the lock, and the supervisor confirms isolation before the work begins.

Common mistakes

  • Trusting the machine's stop button or a colleague's word that the supply is off.
  • Removing another person's lock to restore power, because the job looks finished.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →