Energy meter

An energy meter is an instrument that measures electricity consumed, in kilowatt hours, and in many models also demand, voltage and power factor.

What it means

The utility's meter at the entry point decides the bill. Businesses also install their own meters on machines, floors or departments to find where power goes. Digital meters can store readings and send them to a computer. Accuracy matters, because decisions on cost and efficiency depend on it, and a faulty meter can mean overbilling or missed waste.

Example

A garment unit in Noida notices a high bill. A meter fitted on the stitching floor shows it uses 38 percent of power, while the air conditioning uses 30 percent. The owner decides to start with the air conditioning schedule.

Records and checks

  • Record meter number, location, multiplying factor, installation date and each reading with its time.
  • Verify the meter against the utility's with a periodic comparison and calibration where needed.
  • The electrical in charge takes readings on a schedule and the accountant compares totals with the bill.

Common mistakes

  • Forgetting the multiplying factor, so readings are understated.
  • Never checking an old meter that may drift.