EOQ is the abbreviation for economic order quantity: the order size that keeps the combined cost of placing orders and carrying stock at its lowest.

What it means

Purchase teams use EOQ as a starting point for how much to buy each time, not as a rule that cannot be bent. It suits items with regular consumption, such as packing material or fasteners. It needs three inputs: yearly use, what each order costs you, and what it costs to keep one unit for a year, including interest on money tied up.

Example

A tool room uses 2,400 cutting inserts a year. Placing an order costs ₹600 and holding one insert costs ₹12 a year. EOQ is about 490 inserts, so it orders roughly every two and a half months.

Records and checks

  • Record annual use, ordering cost and carrying cost per unit, with how each was estimated.
  • Verify the quantity against minimum order sizes, storage space and expiry.
  • The purchase manager recalculates yearly and signs off the rounded order quantity.

Common mistakes

  • Keeping the same EOQ for years while prices, freight and usage have moved.
  • Applying it to project-based items with lumpy demand, where steady use cannot be assumed.