Equipment availability
Equipment availability is the proportion of planned operating time during which a machine is ready and able to run, usually shown as a percentage.
What it means
It is calculated by taking the hours a machine was ready, dividing by the hours it was meant to run, and multiplying by 100. Breakdowns, waiting for spares and unplanned stoppages lower it; planned servicing is counted separately in most practice. A high figure means the machine is there when production needs it. It is one of the three parts of overall equipment effectiveness.
Example
A machine is scheduled for 200 hours in a month. It is down for 14 hours due to a failed motor and 6 hours waiting for a spare, so it runs 180 hours: availability is 90 per cent.
Records and checks
- Record planned hours, downtime hours and the reason for each stoppage.
- Verify downtime against operator logs and supervisor notes, not memory.
- The production supervisor logs hours; the maintenance head reviews availability each month.
Common mistakes
- Counting planned servicing and idle waiting as breakdowns, or the other way around, without a consistent rule.
- Not recording short stoppages, which makes availability look better than it is.