lamp.
ResourcesPricingAbout

Failure code

A failure code is a short standard code or label used to classify the cause or type of an equipment failure, such as bearing wear or electrical fault.

What it means

Free-text notes such as "motor problem" or "not working" cannot be counted. With a fixed list of codes, each repair is tagged the same way, so you can later see which faults happen most and on which machines. A usable list is short, with perhaps 15 to 30 entries, grouped into mechanical, electrical, hydraulic, operator, material and unknown.

Example

A press shop logs 60 breakdowns in a quarter. Counting the codes shows 21 are hydraulic hose leaks, so the owner changes the hose supplier and specification, and leak failures fall to 7 the next quarter.

Records and checks

  • Record the failure code, machine ID, date, downtime hours and repair on every breakdown.
  • Verify that codes are used consistently and that "other" does not become the biggest category.
  • The technician selects the code; the maintenance head reviews counts by code each month.

Common mistakes

  • Making the list so long that technicians pick the first code they see.
  • Coding the symptom, such as "stopped", instead of the cause.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →