First pass yield
First pass yield is the percentage of units that pass inspection the first time through a process, without any rework, repair or scrapping.
What it means
The figure is good units first time divided by total units started, times 100. It shows hidden waste, because a plant can ship good output yet spend heavily on fixing and re-testing. A shop reporting 95 per cent final acceptance may have only 80 per cent first pass yield. Measure it per process step to see which operation causes the problems.
Example
A line assembles 500 switches in a day. 40 fail the first test and are reopened, and 10 of those are finally scrapped. First pass yield is 460 ÷ 500, which is 92 per cent, though 98 per cent of units are shipped.
Records and checks
- Record units started, passed first time, reworked and scrapped, by shift and process step.
- Verify that a reworked unit is not counted as first-time good when it passes the second check.
- The production supervisor tracks it daily; the quality head reviews the trend monthly.
Common mistakes
- Counting rework as good output, which hides the cost of repeated handling.
- Reporting one plant-wide number without step-level data, so nobody knows where to act.