First piece inspection

First piece inspection is the check of the first part made after a setup, tool change or shift start, so errors are found before the batch is run.

What it means

After a setup or tool change, a machine can drift off size. The operator makes one piece, measures the key dimensions and has the inspector approve it before the run continues. A wrong setting caught at piece one costs one piece; caught at the end it can cost the whole lot. It is routine at each setup, unlike first article inspection, a formal check for new parts.

Example

A turning shop sets up a lathe for 1,000 shafts. The first shaft is 0.05 mm over on the bearing diameter, so the operator adjusts the offset, gets approval and runs the batch, avoiding about ₹45,000 of rejected shafts.

Records and checks

  • Record the part, machine, operator, date, readings of key dimensions and the approver's initials.
  • Verify the instruments used are within their calibration period.
  • The line inspector or supervisor approves the piece before the operator proceeds.

Common mistakes

  • Letting the operator approve their own piece when an independent check is required.
  • Skipping the check after a mid-shift tool change because the setup was approved earlier.