lamp.
ResourcesPricingAbout

Fit sample

A fit sample is a garment made in the base size to check how it fits on a model or form and whether its measurements match the specification.

What it means

It is made after the first pattern. The buyer or technical team puts it on a fit model, checks the drape, comfort, length and key measurements, and writes comments to change. Several rounds may follow. Each round has a log of changes. Once the fit is approved, the pattern is locked and graded to other sizes.

Example

A women's top for a Delhi brand goes through two fit rounds. In round one the armhole is 1.5 cm too tight and the length 2 cm short. Both are corrected, and round two is approved, at a total sampling cost of ₹14,000.

Records and checks

  • Record the measurements taken, comments, photos and pattern changes per round.
  • Verify the changes in the next sample match the comments.
  • The technician or merchandiser tracks rounds; the buyer signs the final approval.

Common mistakes

  • Making the next round without writing down which comments were applied.
  • Checking fit on a form that does not match the buyer's fit model.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →