Goods issue

A goods issue is the recorded movement of items out of stores, whether for a customer shipment, to production, as a sample or on transfer, which reduces the stock held.

What it means

Stock records stay accurate only if every removal is recorded at the time it happens. The issue states the item, quantity, purpose and who authorised it. Issues to production reduce raw material and become work in progress, while issues for sale reduce finished goods. Unrecorded issues are a main cause of stock mismatches.

Example

A fabrication unit issues 300 kg of MS plate from stores to job 118 on Monday morning. The store keeper records the issue slip with the job number, so material cost is booked to the job and the plate stock drops by 300 kg.

Records and checks

  • Record the issue slip number, item, quantity, purpose or job number, date and who authorised and received it.
  • Verify the physical quantity at the time of issue and the balance against the stock record.
  • The store keeper records it, and the department head authorises it.

Common mistakes

  • Letting production collect material without a slip, then trying to match it at month-end.
  • Issuing against a general account, so no job bears the cost.