lamp.
ResourcesPricingAbout

Horsepower

Horsepower is a unit of power used to rate engines and motors; one horsepower is about 0.746 kilowatts, or 746 watts.

What it means

Motors, pumps and compressors in India are still sold by horsepower, even though electricity bills use kilowatts. To compare them, convert with the factor of 0.746. A 10 horsepower motor can deliver about 7.5 kW of shaft power, and it will draw somewhat more than that from the supply because no motor is perfectly efficient. Knowing both numbers helps estimate running costs.

Example

A water pump of 5 horsepower in a Surat dyeing house delivers 3.7 kW at the shaft. Drawing about 4.2 kW from the line, it uses roughly 4.2 units an hour, and at ₹8 a unit running 10 hours costs about ₹336.

Records and checks

  • Record horsepower and kilowatt rating of each motor from its nameplate in the equipment register.
  • Verify the conversion and actual running current against the nameplate, since motors are often replaced with a different size.
  • The electrical in charge keeps the register current and reviews it with the energy bill.

Common mistakes

  • Treating horsepower as the electricity drawn, ignoring losses.
  • Writing a motor as 5 kW when the nameplate says 5 horsepower.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →